2016-05-07
The project includes the installation of two coal fired water boilers with capacity of 29MW and related ancillary facilities, the construction or reconstruction of 8 heat exchange stations, the building of a 2×7.56km level-A heating pipe network and the grid integration of 41 arcolas from 31 businesses, so as to meet the heating demand of 880,000 square meters urban areas of Minle County while at the same time reduce overall energy consumption and the emission of CO2 and other waste gases and residues. It belongs to the energy efficiency increasing projects. Once fully completed, it can cut the annual greenhouse gas emission by 43,539 tCO2e.
Page Views : 238