2016-07-14
The project mainly is to install 1×130t/h high temperature and high pressure gas-fired boiler and 1×30MW condensing turbo generator and ancillary facilities, with the aim of achieving the annual energy output of 208.152 million kWh and power supply of 191.5 million kWh. The project belongs to the category of energy saving and efficiency improving. It is estimated to reduce greenhouse gas emission by 153,966tCO2e annually after put into operation.
From :Page Views : 176