2016-09-14
The project was granted a concessional loan of RMB 60 million yuan on May 12, 2016. The project mainly includes building an initiating pump station, purchasing 8 water source heat pumps and 8 shell heat exchangers and installing 69,258 meters of pipes. Through central heating, it will remove the existing small boilers and effectively reduce coal consumption, thus saving energy and reducing emission. The project belongs to the category of energy saving and efficiency improving. It can leverage private funds amounting to RMB 142.15 million yuan. Once put into operation, it is estimated to cut greenhouse gas emission by 29,036tCO2e annually.
Page Views : 218