current position :Shanghai

Shanghai Xinhongqiao International Medical Center Distributed Energy Station Project of Shanghai Shenergy New Hongqiao Energy Co., Ltd.

2019-09-10

The project was approved concessional loan of RMB 69 million from the CDM Fund on August 30 2019 and guaranteed by Shenergy Group Finance Co., Ltd..

The project mainly aims at constructing 2 10.5MW and 2 5.6MW condensing gas boilers, 8 1300RT centrifugal high-efficiency electric chillers, 2 sets of 2,400KW gas lithium bromide units, 7,000 cubic meters of water storage system, and 2 sets of 2,000KW gas engine distributed energy supply system and corresponding supporting facilities and energy supply pipeline system. It belongs to the category of energy-saving and energy efficiency enhancement. The project uses natural gas fuel which has low emission to achieve a combined supply of heat, electricity and cood power to reduce greenhouse gas emissions.After the project is completed, it is estimated that the annual cold supply will be 231,000 GJ and the heat supply will be 190,000 GJ. And it’s estimated to cut down greenhouse gas emission by 6,010 tCO2e annually.

From :

Author: Page Views : 290

Contact Us  |  Join us | Links | Site Map

Website

Wechat